Your pace started whispering before your volume finally dropped.
The fuller export changes the story. This is not just a 2021–2022 collapse chart anymore. It is a longer running arc: foundation, a huge 2020 peak, a slower decline through 2021–2022, a real rebuild in 2023–2024, and another softness emerging in 2025. The recurring signal is not just fewer miles. It is pace degradation showing up before or alongside the training drop.
Full-History Weekly Story — Volume vs. Pace
Green shows weekly distance. Purple shows median pace, with the pace axis inverted so faster reads higher. Use the chapter buttons to spotlight the key eras. This view makes the updated story visible all at once: the 2020 engine, the decline, the rebuild, and the softer fade into 2025.
weekly km weekly median pace highlighted chapter marathon+/goggins markers
Annual Shape — Peak, Fall, Rebuild, Soft Decline
Bars show annual kilometers. The line shows median pace for the year. This is the cleanest summary of the new arc.
2020 is the clear high-water mark. 2023–2024 prove the comeback was real. 2025 shows fresh softness rather than a clean return to peak form.
Recent Zoom — 2024 to 2026
Recent months make the newest shift easier to read. You can see the 2024 baseline, the 2025 slide, and the light 2026 year-to-date.
This panel is the “what changed lately?” view. The biggest current question is whether 2026 is the start of another rebuild or just a low-volume continuation.
Monthly Volume Across the Full Timeline
The monthly bars show just how different the eras feel. Strong, dense years have a steady skyline. Softer periods break apart.
What stands out now is not just the 2021–2022 fall. It is that the post-2022 rebuild never fully recaptured the 2020 shape, and 2025 breaks lower again.
Marathon+ Efforts Across Time
Every marathon-or-longer run in the export is highlighted here. Gold dots are marathons. Coral dots are 50k-plus efforts. Select any effort in the list to inspect the full stat line and see where it lands in the arc.
This becomes a second story layered on top of the training arc: peak-year volume is one thing, but the marathon-plus record shows how often you actually carried that fitness into very long efforts.
Goggins challenge comparison
Selected Marathon+ Detail
A running ledger of the biggest days in the file. Click any entry to update the stat strip and timeline emphasis.
Two Goggins completions spotted
2020 and 2023 both show full 4×4×48 completions — with a clear pace shift
Long-race story
Marathons and ultras tell a slightly different story than weekly training
2021 signal window
Zoom-In — Pace Softness Before the 2021 Drop
This panel isolates the weeks before the late-2021 slide. The smoothed pace line turns slower before the weekly volume fully gives way.
This is the pattern you were after: the pace line drifts downward first, then the weekly distance starts to break lower. It is not a dramatic cliff in a single week — it is a softening trend.
2022 signal window
Zoom-In — Pace Softness Before the 2022 Break
The same lens on the 2022 stretch. The shape is not identical, but the warning behavior is similar: pace gets mushier while volume is still trying to hold together.
This second zoom matters because it makes the pattern feel repeatable instead of anecdotal. The body-level warning shows up in the pace profile before the training story is obviously broken.
Peak Engine
2020 remains the reference point
That year combined your highest volume with your strongest overall pace profile. It is still the clearest picture of what full training momentum looked like in this dataset.
Rebuild
2023 and 2024 were a real comeback
The new export changes the emotional read. After 2022, you did rebuild meaningful volume. The comeback was real. It just happened at a lower ceiling than your 2020 peak.
Leading Signal
Pace softness is the signal to watch
The useful pattern is not only reduced mileage. It is slower pace showing up while you are still active. That is the more actionable warning in the larger history.
Build Notes
• Source file: activities.csv
• Scope: run activities only
• Distance: meters converted to kilometers
• Pace: average speed converted to min/km; weekly and annual views use median pace
• Story framing: peak → decline → rebuild → soft decline, with pace as the leading signal